CONNECTA-3 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3

Summary
Continuation project of CONNECTA-2 (GA 826098) which targets the high TRL deployment and validation in two relevant laboratory
demonstrators and field tests for urban and regional scenarios of the following technologies:
- Wireless TCMS, including wireless train backbone, wireless consist network and standardized train-to-ground according to IEC 61375-2-6.
- NG-TCN including high safe (SIL4) communication networks to support the drive-by-data concept, including brake-by-wire.
- Functional Open Coupling (FOC)
- Functional Distribution Framework (FDF) instantiated with two different approaches (modified AUTOSAR and selfimplemented
on top of specific operating system), together with relevant application profiles.
- The virtual certification simulatiom framework, with hardware-in-the-loop and remote connectivity to subsystems
The goal is to reach TRL6/7 in most developments.
Unfold all
/
Fold all
More information & hyperlinks
Web resources: https://cordis.europa.eu/project/id/101014811
Start date: 01-12-2020
End date: 30-11-2023
Total budget - Public funding: - 3 945 623,00 Euro
Cordis data

Original description

Continuation project of CONNECTA-2 (GA 826098) which targets the high TRL deployment and validation in two relevant laboratory
demonstrators and field tests for urban and regional scenarios of the following technologies:
- Wireless TCMS, including wireless train backbone, wireless consist network and standardized train-to-ground according to IEC 61375-2-6.
- NG-TCN including high safe (SIL4) communication networks to support the drive-by-data concept, including brake-by-wire.
- Functional Open Coupling (FOC)
- Functional Distribution Framework (FDF) instantiated with two different approaches (modified AUTOSAR and selfimplemented
on top of specific operating system), together with relevant application profiles.
- The virtual certification simulatiom framework, with hardware-in-the-loop and remote connectivity to subsystems
The goal is to reach TRL6/7 in most developments.

Status

SIGNED

Call topic

S2R-CFM-IP1-02-2020

Update Date

26-10-2022
Images
No images available.
Geographical location(s)